Brickland MRT Station

$
0
0
NS3A
Brickland
Artist’s Impression of Brickland NSL Station (Image: LTA)
Address
Line Served   North South Line
Operator SMRT Trains
Structure Elevated
Platform TBC
Opening Year 2034

Brickland Station is an above-ground station along the North South Line (NSL), to be constructed from 2024. It will be located above Bukit Batok West Avenue 5, to the south of the junction with Brickland Road and Bukit Batok Road.

Both Brickland and Sungei Kadut stations were announced on 25 May 2019 as part of the LTA’s Land Transport Master Plan 2040. These stations are infill stations along the NSL targeted for completion before 2040. Previously, Dover and Canberra stations were built as infill stations along the EWL and NSL, opening in 2001 and 2019 respectively.

Additional details for Brickland station was announced by the Land Transport Authority in July 2023.


Train Services

North South Line


Construction

Construction for Brickland station is expected to commence in 2024. A new viaduct and crossover tracks will also be constructed in addition to Brickland station.

The pre-qualification (Ref. PQ115) for Design and Construction of New Station and Viaduct on the North-South Line was closed on 28 June 2023.